MUD 365 is in the process of upgrading the water plant on Telge road on behalf of MUD 364. Part of this construction will consist of drilling a new water well. The drilling operations can be loud at times therefore a TEMPORARY sound wall has been constructed to help reduce noise. While completion of construction is scheduled in April 2019, the drilling is scheduled to only take 1 ½ – 3 months. Once drilling is complete, the sound wall should come down. If all goes as planned, the wall should be gone before the end of the year.